Technical Infrastructure

Power source: From 110KVA transformer station located in Duc Hoa III industrial zone – Slico along provincial road 823B.
– Power supply standard: 250 kW/ha; Tmax=4,000 h/year.
– Demand for electricity:
+ Total required power capacity (taking into account 10% loss and 5% backup): 34,947.41kW.
+ Total required power (taking into account 10% loss and 5% backup): 1,394.18 million kWh/year.
Net:
– Connecting the 22kV line from the existing 22kV line along provincial road 823B (36m road) leading to works with floating aluminum cables and steel cores. The electric lines must ensure the height according to the regulations of the electricity industry.
– Arrange transformer stations to supply electricity for street lights.
– The 0.4kV power line supplies electricity for underground street lights, the street lights are high-voltage Sodium 220V-250W lamps, open and close by photoelectric or timing switches.

Investment Incentive

Corporate tax incentives for a period of 10 years.

Supporting Consultant

Guiding and supporting businesses on registration procedures,…

Visit Registration

Businesses wishing to visit Slico Industrial Park to book the land lease. Please register.

Messenger Zalo Call